
Our Recent Work
Every project reflects our commitment to precision, safety, and delivering on time and on budget.

Great Lakes Distribution Center
180,000 sq ft distribution facility with 45-foot clear heights, 60 loading docks, and a structural steel frame engineered for heavy snow loads.

Midwest Commerce Plaza
Six-story Class A office building with 95,000 sq ft of leasable space, curtain wall facade, and integrated steel framing throughout.

Rivertown Manufacturing Plant
75,000 sq ft heavy manufacturing facility with crane runway systems, reinforced foundations, and explosion-proof construction zones.

Lakeview Medical Office
42,000 sq ft medical office building with specialized HVAC systems, lead-lined imaging suites, and full structural steel framework.

Oakland County Schools Annex
Three-story educational facility addition with steel-framed auditorium, science labs, and 12 classrooms built on an active campus.

Metro Retail Center
55,000 sq ft retail center with steel-framed storefronts, shared loading infrastructure, and pedestrian-friendly plaza design.

Heritage Park Office Campus
Two-building office campus totaling 120,000 sq ft with shared courtyard, structured parking, and high-performance building envelope.

Summit Logistics Hub
210,000 sq ft cross-dock distribution center near Detroit Metro Airport with 100+ dock positions and ESFR sprinkler systems.

Civic Center Renovation
Complete structural renovation and seismic upgrade of a 1960s-era municipal building — completed in phases while the facility remained operational.
Have a Project in Mind?
Tell us about your upcoming project and we'll provide a detailed proposal with timeline, budget, and recommended approach.
Request a Quote